Engineering and risk management
We assess transport feasibility for heavy and oversized cargo before sailing. We prepare the cargo plan, load calculations, lashing and seafastening.

What is included
Engineeringbefore loading
We assess technical feasibility before sailing, while operating constraints can still be addressed in the transport plan. We prepare the engineering basis for underwriter review. We then connect the agreed plan with supervision of its execution during loading.
01
Cargo plan
We develop the cargo arrangement on board, accounting for cargo particulars and loading constraints.
02
Loads and seafastening
We calculate loads on the deck, quay and support points and prepare lashing and seafastening arrangements.
03
Technical review
We prepare the plan for the underwriter and coordinate MWS (Marine Warranty Surveyor) involvement.
04
Loading supervision
We check loading against the agreed transport plan and provide supercargo attendance on board when required.
How it works
Four stepsto execution
From technical data to loading supervision.
01
Inputs
We collect cargo, vessel, quay and crane information. We clarify operating constraints and the scope of the engineering assessment.
02
Assessment
We check the proposed transport arrangement for feasibility. We prepare calculations and identify conditions to be met before loading.
03
Review
We submit the plan for underwriter review and coordinate with MWS. We clarify comments affecting the proposed operating conditions.
04
Execution
We supervise loading against the agreed plan. When deviations arise, we coordinate review of the changes with the parties involved.